All Issue

2024 Vol.61, Issue 2 Preview Page

Research Paper

30 April 2024. pp. 100-110
Abstract
References
1

Culp, S.L., 2002. Hoist arrangements and duty cycles for common hoisting system, Montreal, Canada: ABB Mining Systems.

2

Darling, P., 2011. SME Mining Engineering Handbook (3rd Ed.), Society for Mining, Metallurgy, and Exploration, Inc. (SME), 1646p.

3

Han, W.S., 1973. About yangyang mine shaft development, Journal of the Korean institute of mineral and energy resources engineers, 10(4), p.314-316.

4

Harmon, J.H., 1973. Hoists and Hoisting Systems, SME Mining Engineering Handbook, Chap. 15, SME-AIME, New York, p.15-59.

5

Hartman and Mutmansky, 2002. Introduction Mining Engineering (2nd Ed.), John Wiley & Sons, Inc., New Jersey, 298p.

6

Hustrulid, W.A., 1982. Underground Mining Methods Handbook, Society for Mining, Metallurgy, and Exploration, Inc. (SME), 1386p.

7

Kim, D.G., 1959. Considerations on Koepe hoist, Journal of the Korean institute of mineral and energy resources engineers, 4, p.22-35.

8

Korea Institute of Energy and Resource (KIGAM), 1989. Study for the rationalization of coal mine development, KIGAM report KR-89-5B, pp, Daejeon, Korea, 119p.

9

Lee, W.I., 1982. Regarding the shaft facility construction in Samcheok consolidated coal mine, Journal of the Korean institute of mineral and energy resources engineers, 19(1), p.54-62.

10

Mushiri, T., Jirivengwa, M., and Mbohwa, C., 2017. Design of a hoisting system for a small scale mine, Procedia Manufacturing, 8, p.738-745.

10.1016/j.promfg.2017.02.095
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 61
  • No :2
  • Pages :100-110
  • Received Date : 2024-03-11
  • Revised Date : 2024-04-11
  • Accepted Date : 2024-04-15