All Issue

2017 Vol.54, Issue 2 Preview Page

Research Paper

30 April 2017. pp. 123-138
Abstract
References
1
Ministry of Land, Transport and Maritime Affairs, 2012, Safety check and detailed safety check detailed guide manual(retaining wall), pp. 13-73.
2
Ministry of Construction & Transportation, 1998, Study for standard drawing of retaining wall, pp. 1-7.
3
Mireco, 2007, Basic and detailed design report of Gongju Dukgok mine tailing loss prevention project, pp. 121-182.
4
Mireco, 2007, Basic and detailed design report of Okdong mine tailing loss prevention project, pp. 131-204.
5
Mireco, 2007, Basic and detailed design report of Gangneung Okgye mine tailing loss prevention project, pp. 203-308.
6
Mireco, 2008, Basic and detailed design report of Uljin Ssangchun mine tailing loss prevention project, pp. 92-151.
7
Mireco, 2009, Detailed design report of Guhpoong mine tailing loss prevention project, pp. 92-170.
8
Mireco, 2009, Basic and detailed design report of Yongsuk mine tailing loss prevention project, pp. 75-113.
9
Mireco, 2009, Basic design report of Geumwang mine tailing loss prevention project, pp. 85-145.
10
Mireco, 2009, Detailed design report of Yoojin mine tailing loss prevention project, pp. 33-60.
11
Mireco, 2009, Detailed design report of Daedu mine tailing loss prevention project, pp. 93-178.
12
Mireco, 2009, Detailed design report for contaminated soil recovery of Seojum 1 abandoned metal mine, pp. 63-106.
13
Mireco, 2009, Basic and detailed design report of Hwachun mine tailing loss prevention project, pp. 93-142.
14
Mireco, 2010, Detailed design report of Yeosu mine tailing loss prevention project, pp. 69-102.
15
Mireco, 2011, Detailed design report of Chungyang mine tailing loss prevention project, pp. 68-148.
16
Mireco, 2011, Detailed design report of Youngdae mine tailing loss prevention project, pp. 59-90.
17
Mireco, 2011, Basic and detailed design report of Dongbo mine tailing loss prevention project, pp. 47-79.
18
Mireco, 2012, Safety evaluation and development of maintenance technique for tailing dam, pp. 7-69.
19
Mireco, 2012, Detailed design report of Moogeuk mine tailing loss prevention project, pp. 24-29.
20
Mireco, 2013, Safety evaluation and development of maintenance technique for tailing dam, pp. 5-80.
21
Mireco, 2014, Safety evaluation and development of maintenance technique for tailing dam, pp. 6-68.
22
Mireco, 2016, Post maintenance and operation rule of mine reclamation facility, pp. 7-9.
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 54
  • No :2
  • Pages :123-138
  • Received Date : 2017-02-13
  • Revised Date : 2017-04-11
  • Accepted Date : 2017-04-20