All Issue

2018 Vol.55, Issue 4 Preview Page

Technical Report

31 August 2018. pp. 314-322
Abstract
References
1
Chen, K., Hong, K.R. and Jiao, S.J., 2016. Shield Construction Technique (2nd Ed.), China Communications Press, Beijing, China, 548p.
2
Chen, K. and Zhou, P., 2017. China Shield, Yilin Press, Beijing, China, 320p.
3
China Construction Machinery Association, 2018.04.20, http://info.cncma.org
4
Deng, M.J., 2016. Key techniques for group construction of deep-buried and super-long water transfer tunnel by TBM. Chinese J. of Geotechnical Engineering, 38(4), 577-587.
5
Fang, Y.M., Liu, N., Zhang, C.Q., Chu, W.J. and Chen, X.H., 2013. Rockburst risk control for large diameter TBM boring in high geostress region. Chinese J. of Rock Mechanics and Engineering, 32(10), 2100-2107.
6
Hong, K.R., Chen, K. and Feng, H.H., 2013. The innovation and breakthrough of shield technology in China. Tunnel Construction, 33(10), 801-808.
7
Hong, K.R., 2015. State-of-art and prospect of tunnels and underground works in China. Tunnel Construction, 35(2), 95-107.
8
Hong, K.R., 2017. Development and prospects of tunnels and underground works in China in recent two years. Tunnel Construction, 37(2), 123-134.
9
Le, G.P., He, S.H. and Luo, F.R., 2012. Beijing Subway Shield Tunneling Technology, China Communications Press, Beijing, China, 761p.
10
Li, J.B., 2017. Key Technologies and Applications of the Design and Manufacturing of Non-Circular TBMs. Engineering, 3(6), 905-914.
10.1016/j.eng.2017.12.002
11
Liao, H.Y., 2012. Technology for Shield Tunnel in Mixed face ground conditions – Study & Practice in Shield Tunneling projects of Guangzhou Metro, China Architecture & Building Press, Beijing, China, 195p.
12
Liu, Q.S., Huang, X., Liu, J.P. and Pan, Y.C., 2015. A prospect of researches on interaction and safety control between TBM and deep mixed ground. J. of China Coal Society, 40(6), 1213-1224.
13
Ministry of Science and Technology of China, 2018.04.20, http://www.most.gov.cn
14
Song, F.L. and Zhao, H.L., 2017. Study of key construction technologies of open TBM in complex geological conditions: case study of gaoligongshan tunnel. Tunnel Construction, 37(S1), 128-133.
15
Sun, L.C., Zhang, Z., Wang, Z.H. and Wang, G.S., 2017. Construction Technology of EPB Shield in Waterless Sandy Cobble Stratum, China Communications Press, Beijing, China, 277p.
16
Wang, M.S., 2014. Tunnelling by TBM/shield in China: State of art, problems and proposals. Tunnel Construction. 34(3), 179-187.
17
Wang, H.D., Wei, K.L. and Zhu, W.B., 2016. Research on Shield Tunneling in Guangzhou line 6, China Communications Press, Beijing, China, 332p.
18
Wang, J.Y., 2017. Super large diameter shield tunneling technologies in China in recent decade. Tunnel Construction, 37(3), 330-335.
19
Wu, X.P., Liu, J., Zhu, H.J. and Fang, J.H., 2016. A Review of TBM Engineering in China, China Communications Press, Beijing, China, 703p.
20
Xiao, M.Q., 2018. Representative projects and development trend of underwater shield tunnels in China. Tunnel Construction, 38(3), 360-371.
21
Yang, S.J., Sun, M. and Hong, K.R., 2011. Shield Construction Technology in Water-rich Sand and Cobble Stratum, China Communications Press, Beijing, China, 283p.
22
Yang, C. and Peng, F.L., 2016. Discussion on the development of underground utility tunnels in China. Procedia Engineering, 165, 540-548.
10.1016/j.proeng.2016.11.698
23
Zhao, H. and Chen, K., 2013. Discussion on the development direction of shield electro-hydraulic control technology. Design & Research, 5, 54-86.
24
Zhu, Y.F., Li, L. and Wu, H.M., 2018. Extra-large undersea shield tunnel in composite ground: maliuzhou traffic tunnel in Zhuhai. Tunnel Construction, 38(3), 494-500.
10.1504/IJMME.2016.076500
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 55
  • No :4
  • Pages :314-322
  • Received Date : 2018-06-12
  • Revised Date : 2018-08-27
  • Accepted Date : 2018-08-29