Technical Report
Abstract
References
Information
In this study, the priority of mine reclamation project was derived by using Analytic Hierarchy Process. Analytic Hierarchy Process is the representative decision-making methodology to decide a rational economic, business and industrial policy. The evaluation index of mine reclamation program and project were set and opinion of mine reclamation experts about the evaluation index were analyzed in this study. As a results of analysis, it is concluded that this mine reclamation program have to focus on ‘pollution prevention project in the public goods’ and ‘the seriousness of general public’. In addition, analysis of the priority of each mine reclamation project concludes that each mine reclamation project have to focus on ecological damage and the loss of life. In order to perform an effective mine reclamation policy, policy makers must establish mine reclamation policy, focusing on role as public goods of mine reclamation program and minimization of damage of ecosystem and life.
본 연구는 계층화 분석법을 활용하여 광해방지사업의 우선순위 결정을 위한 합리적인 의사결정을 도모하고자 하였다. 계층화 분석법은 합리적인 경제, 경영 및 산업 정책을 결정하기위한 대표적인 의사결정방법론이다. 본 연구는 광해방지사업의 프로그램과 프로젝트 평가지표를 설정했다. 그리고 본 연구는 평가지표에 대한 광해전문가의 의견을 분석하였다. 이러한 광해방지사업 평가모형을 분석해본 결과, ‘광해방지사업의 공공성’ 과 ‘광해의 대국민 심각성’ 항목이 광해방지사업 평가지표로 제일 중요한 것으로 분석되었다. 또한 각 광해방지사업 프로젝트 평가지표의 우선순위 분석에서는 인명 피해와 생태계 피해와 관련된 항목들이 상위 고려사항으로 분석되었다. 이러한 점을 상기해본다면, 광해방지사업은 본연의 공공재적 특성을 강조하고 인명과 생태계에 대한 직접적 피해를 최소화시키는 정책이라는 사실을 부각시키면서 시행할 필요가 있다는 점을 시사한다.
- 유승훈, 이주석, 곽소윤, 어승섭, 2011, “폐광산 광해방지사업의 공익적 가치추정,” 한국지구시스템공학회지, 제48권 2호, pp. 127-136.
- 한국광해관리공단, 2010, 2단계 광해방지기본계획 수립을 위한 연구.
- 한국개발연구원, 2008, 예비타당성조사 수행을 위한 일반지침 수정・보완 연구, 제5판, 공공투자관리센터.
- Keeney, R.L., 1992, Value-Focused Thinking, Harvard University Press, Cambridge.
- Keeney R.L. and McDaniels, T.L., 1992, “Value-focused thinking about strategic decisions at BC Hydro,” Interfaces, Vol. 22, No. 6, pp. 94-109.
- Saaty, T.L., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation, McGraw-Hill, New York.
- Saaty, T.L., 2000, Fundamentals of Decision Making and Priority Theory with The Analytic Hierarchy Process, RWS Publications, Pittsburgh, PA.
- Saaty, T.L. and Keams, K.P., 1985, Analytic Planning : The Organization of System, RWS Publications, Pittsburgh, PA.
- Shin, C.O., Yoo, S.H. and Kwak, S.J., 2007, “Applying the analytic hierarchical process to evaluating the national nuclear R&D projects: the case of Korea,” Progress in Nuclear Energy, Vol. 49, No. 5, pp. 375-384.
- Publisher :The Korean Society of Mineral and Energy Resources Engineers
- Publisher(Ko) :한국자원공학회
- Journal Title :Journal of the Korean Society for Geosystem Engineering
- Journal Title(Ko) :한국지구시스템공학회지
- Volume : 49
- No :3
- Pages :388-394


Journal of the Korean Society of Mineral and Energy Resources Engineers







