All Issue

2004 Vol.41, Issue 4 Preview Page
31 August 2004. pp. 313-318
Abstract
Recently, the heavy-duty diesel equipments are widely operated not only in the underground mines but the construction sites of subway, highway and the other underground openings. However, the diesel equipments are used to produce hazardous materials such as diesel soots(particulate matters), and several kinds of toxic gases which are hazardous to underground workers\\\' health. Therefore it is required air quantity which is enough for diluting the hazardous diesel exhausts. For this purpose, a sample mine(D Limestone Quarry) was selected and a series of processes such as general survey, measurement of gas of working face and analysis of ventilation network were conducted. According to above data, optimum ventilation programs have been suggested after a series of computer simulation process.
최근에는 갱내작업의 대형화에 따라 대형 디젤장비가 석탄과 일반광산은 물론 지하철, 지하차도 등 토목공사 지하공간 개설 작업에도 많이 사용되고 있다. 그러나 디젤장비는 CO, NOx와 같은 유해가스와 입자상물질 같은 유해 물질이 발생되어 근로자의 건강을 악화시키는 단점이 있다. 따라서 석회석 광산은 갱내에서 디젤장비를 사용하고 있으므로 배출되는 오염물질을 희석할 필요가 있다. 본 연구에서는 D 석회석광산을 대상으로 통기현황과 작업장의 유해가스를 측정하고 소요통기량을 산정하였다. 이와 같이 통기계통상의 문제점을 도출하고 갱내 통기망을 전산 해석한 결과를 이용하여 통기개선안을 제시하였다.
References
Sorry, not available.
Click the PDF button.
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society for Geosystem Engineering
  • Journal Title(Ko) :한국지구시스템공학회지
  • Volume : 41
  • No :4
  • Pages :313-318