Abstract
References
Sorry, not available.
Click the PDF button.
Information
This paper is to describe the application of an integrated multiphase flow model on production allocation and timing of compressor installation in gas fields, which have multi-wells and multi-reservoirs. In order to depict flow in reservoir and surface pipeline network (wellbore to market) simultaneously, an integrated multiphase flow model has been developed. The integrated reservoir and surface network flow model includes various sub-models such as a compositional model, a reservoir model, a pipeline multi-phase flow model, a surface network model, and a reservoir-network interfaced model. The integrated model has been applied in Donghae-1 gas field. As a result, the field life has extended through production optimization, and the installation timing of compressor has been delayed.
본 연구는 다중 저류층/다중 생산정이 존재하는 가스 생산 현장에서 저류층 유체의 생산량을 최적으로 할당하고 가스 가압기의 적정가동시기를 결정하기 위하여, 지하 저류층과 지상 배관망에서 저류층 유체의 유동을 동시에 규명할 수 있는 저류층-배관망 통합유동모델을 구축 및 활용하는데 있다. 통합유동모델은 상거동모델, 저류층 생산모델, 파이프라인 다상유동모델, 배관망모델, 저류층-배관망 연계모델과 같은 부속모델로 구성되어 있다. 동해-1 가스전의 최적 생산 시나리오를 도출하기 위하여 통합유동모델을 적용한 결과, 가스 생산량 할당을 통해 가스전 생산수명을 장기화 할 수 있었으며, 또한 가스 가압기 가동시기도 늦출 수 있음을 확인하였다.
Click the PDF button.
- Publisher :The Korean Society of Mineral and Energy Resources Engineers
- Publisher(Ko) :한국자원공학회
- Journal Title :Journal of the Korean institute of mineral and energy resources engineers
- Journal Title(Ko) :한국자원공학회지
- Volume : 38
- No :6
- Pages :472-481


Journal of the Korean Society of Mineral and Energy Resources Engineers







