All Issue

2018 Vol.55, Issue 3 Preview Page

Research Paper

29 June 2018. pp. 205-212
Abstract
References
1
Adams, A.J., Grundy, K.C., and Kelly, C.M., 2015. Probabilistic Well Time Estimation Revisited: Five Years On. Proc. of SPE/IADC Drilling Conference and Exhibition, London, England, UK, p.1-48.
10.2118/173028-MS
2
Akins, W.M., Abell, M.P., and Diggins, E.M., 2005. Enhancing Drilling Risk & Performance Management Through the Use of Probabilistic Time & Cost Estimating. Proc. of SPE/IADC Drilling Conference, Amsterdam, The Netherlands, p.1-9.
10.2118/92340-MS
3
Budzaya, U., 2013. A Study on Estimation of CBM Resources Using Probabilistic Approach from Coal Basin Information, Master Thesis, Chonnam National University, Gwangju, p.6-14.
4
Choi, S., Kim, J., Park, B., Bae, J., Jang, G., and Choi, J., 2011. Technical Review of the Drilling Operations of WA- 1001BX and Alm-1001BX in Block 4, Yemen. J. of Korean Society of Mineral and Energy Resources Engineers, 48(6), 802-812.
5
Chung, Y., 2013. Analysis and Evaluation of Net Present Value by means of Monte Carlo Simulation. J. of Korean Society of Hazard Mitigation, 13(6), 15-19.
10.9798/KOSHAM.2013.13.6.015
6
Hollund, K., Rosenlund, H., Akcora, S., and Hauge, R., 2010. Hitting Bull's-Eye with Time and Cost Estimates by Combining Statistics and Engineering. Proc. of SPE Annual Technical Conference and Exhibition, Florence, Italy, p.1-6.
7
Jang, G., Kang, B., Lim, J., Hwang, C., and Ryou, S., 1999. A New Approach to Reducing Drilling Costs in Offshore Drilling. J. of Korean Society of Mineral and Energy Resources Engineers, 36(6), 435-447.
8
Kim, J.S., Shin, H.J., and Lim, J.S., 2014. Probabilistic Decline Curve Analysis for Forecasting Estimated Ultimate Recovery in Shale Gas Play. J. of Korean Society of Mineral and Energy Resources Engineers, 51(6), 808-819.
9
Lim, J.S., Kang, P.S., and Kim, H.T., 2010. Current Technologies and Field Cases of Onshore Deep Oil Well Drilling. J. of Korean Society of Mineral and Energy Resources Engineers, 47(5), 809-821.
10
Merlo, A., Paolo, A., Tove, L., and Oystein, A., 2009. An Innovative Tool on a Probabilistic Approach related to the Well Construction Costs and Times Estimation. Proc. of EUROPEC/EAGE Conference and Exhibition, Amsterdam, The Netherlands, p.1-10.
10.2118/121837-MS
11
Min, T., Yi, J., Oh, H., Chun, Y., Bae, J., Jang, G., and Lee, S., 2012. Technical Review of the Drilling Operation of QT-1 in Block Qush tappa, Iraq. J. of Korean Society of Mineral and Energy Resources Engineers, 49(1), 80-90.
12
Radhwi, A.O., Amer, M.M., Idrees, H., Fakhruddin, A., and Hazzazi, M.A., 2013. WellPlanET_Smart & Efficient Drilling Well Program by Saudi Aramco. Proc. of SPE Middle East Intelligent Energy Conference and Exhibition, Manama, Bahrain, p.1-10.
10.2118/167481-MS
13
Saibi, M., 2007. A Probabilistic Approach for Drilling Cost Engineering and Management. Proc. of SPE/IADC Middle East Drilling and Technology Conference, Cairo, Egypt, p.1-13.
10.2118/107211-MS
14
Steve, D., 1998. Practical Well Planning and Drilling Manual, PennWell Books, Tulsa, Oklahoma, U.S.A., p.3-15.
15
Suh, J., Choi, Y., and Park, H., 2008. DrillerGeoDB: Windows- based Database Program for Effective Management of Drilling Data in Oil and Gas Industry. J. of Korean Society of Mineral and Energy Resources Engineers, 45(6), 707-718.
16
Williamson, H.S., Sawaryn, S.J. and Morrison, J.W., 2006. Monte Carlo Techniques Applied to Well Forecasting: Some Pitfalls. Proc. of SPE Annual Technical Conference and Exhibition, Houston, Texas, U.S.A., p.1-12.
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 55
  • No :3
  • Pages :205-212
  • Received Date : 2018-06-15
  • Revised Date : 2018-06-26
  • Accepted Date : 2018-06-26