All Issue

2026 Vol.63, Issue 5 Preview Page

Research Paper

31 October 2026. pp. 885-897
Abstract
References
1

Black, F. and Scholes, M., 1973. The pricing of optional and corporate liabilities, The Journal of Political Economy, 81(3), p.637-654.

10.1086/260062
2

Cho, S., 2024. Estimation of the put option value for solar power plant operators participating in the renewable portfolio standard (RPS) spot market, Journal of the Korean Society of Mineral and Energy Resources Engineers, 61(5), p.363-372.

10.32390/ksmer.2024.61.5.363
3

Cox, J.C., Ross, S.A., and Rubinstein, M., 1979. Option pricing: A simplified approach, Journal of Financial Economics, 7(3), p.229-263.

10.1016/0304-405X(79)90015-1
4

Dixit, A.K. and Pindyck, R.S., 1994. Investment under Uncertainty, Princeton University Press, Princeton, NJ, USA, 476p.

10.1515/9781400830176
5

Lee, D. and Park, C., 2025. A case study on the economic feasibility for offshore wind power in South Korea from the perspective of project participants. Journal of the Korean Society of Mineral and Energy Resources Engineers, 62(1), p.1-11.

10.32390/ksmer.2025.62.1.001
6

Lee, I. and Heo, E., 2004. An option pricing model for the natural resource development projects, Environmental and Resource Economics Review, 13(4), p.735-761.

7

Moon, Y., 2018. Economic valuation of wind power energy under profit uncertainty: A real option model, Journal of the Korean Operations Research and Management Science Society, 43(3), p.1-14.

10.7737/JKORMS.2018.43.3.001
8

Myers, S.C., 1977. Determinants of corporate borrowing, Journal of Financial Economics, 5(2), p.147-175.

10.1016/0304-405X(77)90015-0
9

Park, C., Kang, J.M., and Min, B., 2013. Compound real options incorporated with stochastic approach for evaluating an uncertainty in petroleum exploration, Energy Sources Part B, 8(3), p.252-262.

10.1080/15567240903117617
10

Park, H. and Jang, C., 2007. Real option analysis for medium-scale CHP plant investment with volatile electricity prices, Environmental and Resource Economics Review, 16(4), p.763-781.

11

Park, H., Jang, H., and Lee, J., 2020. Real option analysis of solar power energy grid cost under electricity price uncertainty, Journal of the Korean Society of Mineral and Energy Resources Engineers, 57(1), p.77-85.

10.32390/ksmer.2020.57.1.077
12

Trigeorgis, L., 1996. Real Options: Managerial Flexibility and Strategy in Resource Allocation, MIT Press, Cambridge, MA, USA, 427p.

13

Yescombe, E.R., 2021. Principles of Project Finance (2nd ed.), Academic Press, San Diego, USA, 578p.

14

Yoo, C., Kim, J., and Heo E., 2011. A real option valuation model for resources exploration projects, Journal of the Korean Society for Geosystem Engineering, 48(3), p.255-267.

15

Yoon, Y., Oh, S., and Kim. J., 2014. An real option application on the feasibility study of an Indonesian CBM project, Journal of the Korean Society of Mineral and Energy Resources Engineers, 51(5), p.631-640.

10.12972/ksmer.2014.51.5.631
16

Yun, W., Sonn, Y., and Kim, S., 2003. An economic feasibility study on power plant construction and operation using real options, Environmental and Resource Economics Review, 12(2), p.217-244.

Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 63
  • No :5
  • Pages :885-897
  • Received Date : 2026-07-27
  • Revised Date : 2026-09-18
  • Accepted Date : 2026-09-18