All Issue

2024 Vol.61, Issue 6 Preview Page

General Remarks

31 December 2024. pp. 517-532
Abstract
References
1

Barton, N., Lien, R., and Lunde, J., 1974. Engineering classification of rock masses for the design of rock support, Rock Mechanics and Rock Engineering, 6, p.189-236.

10.1007/BF01239496
2

Bieniawski, Z.T., 1989. Engineering rock mass classification, Join Wiley & Sons, NY, 251p.

3

Cheon, D.S. and Jin, K.M., 2017. Analysis of microseismic waveform for safety management of rock mass structures, Journal of the Korean Society of Mineral and Energy Resources Engineers, 54(5), p.467-479.

10.12972/ksmer.2017.54.5.467
4

Cheon, D.S., Jung, Y.B., and Park, E.S., 2014. Development of acoustic emission monitoring system for the safety of geotechnical structures, Journal of Korean Tunneling Underground Space Association, 16(5), p.471-485.

10.9711/KTAJ.2014.16.5.471
5

Chung, S.K., C. Sunwoo, S.J., and Cho, S.J., 2010. Introductory Mining Engineering, CIR, Seoul, Korea, 538p.

6

Darling, P., 2011. SME Mining Engineering Handbook Third Edition, SME, Englewood, USA, 1840p.

7

Esterhuizen, G.S., Dolinar, D.R., and Ellenberger, J.L., 2011. Pillar strength in underground stone mines in the United States, International Journal of Rock Mechanics & Mining Sciences, 48(1), p.42-50.

10.1016/j.ijrmms.2010.06.003
8

Esterhuizen, G.S., Dolinar, D.R., Ellenbergen, J.L., Prosser, L.J., and Iannacchione, A.T., 2007. Roof stability issues in underground limestone mines in the United States, Proceedings of the 26th International Conference on Ground Control in Mining, Morgantown, WV, p.336-343.

9

Hoek, E. and Martin, C.D. 2014. Fracture initiation and propagation in intact rock- A review, Journal of Rock Mechanics and Geotechnical Engineering, 6(4), p.287-300.

10.1016/j.jrmge.2014.06.001
10

Hoek, E., 1994. Strength of rock and rock masses, ISRM News Journal, 2(2), p.4-16.

11

Iannacchione, A., Miller, T., Esterhuizen, G., Slaker, B., Murphy, M., Cope, N., and Thayer, S., 2020. Evaluation of stress-control layout at the subtropolis mine, Pertersburg, Ohio, International Journal of Mining Science and Technology, 30(1), p.77-83.

10.1016/j.ijmst.2019.12.00932411494PMC7224684
12

Institute of Energy and Mineral Resources (IMER), 2020. Design of safety pillars in Underground Limestone Mines, IMER Report, Daejeon, Korea, 106p.

13

Institute of Energy and Mineral Resources (IMER), 2021. Development of safety standards for mine openings and pillars in underground mining, IMER Report, Daejeon, Korea, 117p.

14

Jang, M.H., 2018. Probabilistic evaluation of the panel life time using steel beam for panel mining in soft rock, Tunnel and Underground Space, 28(4), p.325-342.

15

Jessu, K.V. and Spearing, A.J.S., 2019. Direct strain evaluation method for laboratory-based pillar performance, Journal of Rock Mechanics and Geotechnical Engineering, 11(4), p.860-866.

10.1016/j.jrmge.2018.12.017
16

Koo, C.M., Jeon, S.W., and Lee, I.W., 2008. Underground mine design and stability analysis at a limestone mine, Tunnel & Underground Space, 18(4), p.243-251.

17

Korea Institute of Geoscience and Mineral Resources (KIGAM), 2005. A study on the Safety and Environmental Control of Underground Openings in Limestone Quarries, KIGAM Report, Daejeon, Korea, 150p.

18

Korea Institute of Geoscience and Mineral Resources (KIGAM), 2021. Development of international reporting guideline and standardization method of economic evaluation on mineral resources & reserves for domestic non-metallic mines, KIGAM Report, Daejeon, Korea.

19

Korea Resources Cooperation (KORES), 2019. Development of optimal design criteria of self-support underground openings for domestic limestone mines, KORES Report, Wonjo, Korea, 104p.

20

Kuhnhein, G. and Ramer, R., 2004. The influence of horizontal stress on pillar design and mine layout at two underground limestone mines, Proceedings of the 23rd Internation Conference on Ground Control in Mining, Morgantown, WV, p.311-319.

21

Lang, B., Pakalnis, P., and Vongpaisal, S., 1991. Span design in wide cut and fill stope at Detour Lake Mine, 93rd annual general meeting, Canadian Institute of Mining, Vancouver, Paper No. 142.

22

Mathews, K.E., Hoek, E., Wyllie, D.C., and Stewart, S.B.V., 1981. Prediction of stable excavation spans for mining at depths below 1,000 meters in hard rock, CANMET Report.

23

Mawdesley, C., Trueman, R., and Whiten, W.J., 2001. Extending the Mathews stability graph for open‐stope design, Transactions of Institution of Mining and Metallurgy(Sect. A : Min.technology), 110(1), A27-39.

10.1179/mnt.2001.110.1.27
24

Monsalve, J.J., Soni, A., Karfakis, M., Hazzard, J., and Ripepi, N., 2022. Stochastic continuous modeling for pillar stress estimation and comparison with 2D numerical and analytical solutions in an underground stone mine, Mining, Metallurgy & Exploration, 39(5), p.1917-1937.

10.1007/s42461-022-00676-z
25

NGI, 2015. Using the Q-system-Rock mass classification and support design, NGI handbook, Oslo, Norway, 54p.

26

NIOSH, 2011. Pillar and roof span design guidelines for underground stone mines, NIOSH Publication No. 2011-171, 64p.

27

Putra, D., Karian, T., Sulistianto, B., and Heriawan, M.N., 2024. Integrating mathews stability chart into the stope layout determination algorithm, Mining, Metallurgy & Exploration, 41, p.1351-1364.

10.1007/s42461-024-00993-5
28

Rocscience, 2024.10.30., https://www.rocscience.com

29

Sakurai, S., 1982. An evaluation technique of displacement measurements in tunnels, Japan Society of Civil Engineers, 317, 93-100.

10.2208/jscej1969.1982.93
30

Sakurai, S., 1983. Displacement measurements associated with the design of underground openings, Proc. International Symposium on Field Measurement in Geomechanics, Zurich, Switzerland, 2, p.1163-1178.

31

Sakurai, S., 1997. Lessons learned from field measurements in tunnelling, Tunnelling and Underground Space Technology, 12(4), p.453-460.

10.1016/S0886-7798(98)00004-2
32

Vlachogiannis, I. and Benardos, A., 2024. Proposed formulas for pillar stress estimation in a regular room and pillar pattern, International Journal of Rock Mechanics and Mining Sciecnes, 180, p.105826.

10.1016/j.ijrmms.2024.105826
33

Xiao, Y.X., Feng, X.T., Hudson, J.A., Chen, B.R., Feng, G.L. and Liu, J.P., 2016. ISRM Suggested Method for In Situ Microseismic Monitoring of the Fracturing Process in Rock Masses, Rock Mech Rock Engineering, 49, p.843-869.

10.1007/s00603-015-0859-y
34

Yoon, D.H. and Song, J.J., 2020. Numerical study in vertical stress estimation for panel pillars at room and pillar mines, Tunnal and Underground Space, 30(5), p.473-483.

Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 61
  • No :6
  • Pages :517-532
  • Received Date : 2024-11-12
  • Revised Date : 2024-12-06
  • Accepted Date : 2024-12-16