All Issue

2024 Vol.61, Issue 4 Preview Page

Technical Report

31 August 2024. pp. 296-306
Abstract
References
1

CGE Risk, 2012. BowTieXP quick start manual, p.9-10.

2

Department of Minerals Resources, 1997. How to conduct a risk assessment of mine operations and equipment and how to manage the risks, Risk Management handbook for the mining industry, NSW department of Primary industries, State of New South Wales, Australia, p.13-15.

3

Ericson, C.A., 2005. Hazard analysis techniques for system safety, John Wiley & Sons, NJ, USA.

10.1002/0471739421
4

Sahu, H.B. and Paithannkar, A., 2011. Hazard Identification and Risk Assessment in mining industry : a case study, 34th International conference of safety in mines research institutes, India Habitat Centre, New Delhi, India, p.467-480.

5

Han, B., Jia, W., Feng, W., Liu, L., Zhang, Z., Guo Y., and Niu M., 2023. Safety risk assessment of loess tunnel construction under complex environment based on game theory-cloud model, Scientific Reports, 13(12249), p.1-18.

10.1038/s41598-023-39377-y37507531PMC10382580
6

Hardy, T.L., 2010. Using accident reports to improve the hazard identification process, 28th International System Safety Conference, Minneapolis, USA.

7

Korean Tunnel Association, 2010. Case histories of tunnel collapse, CIR Ltd, Seoul, Korea.

8

Michalsen, A., 2010. Risk assessment and perception, International Journal of Injury Control and Safety Promotion, 10(4), p.201-204.

10.1076/icsp.10.4.201.1678214664362
9

O'Beirne, T.J. and Napper A., 1990. Introduction of Systematic Safety Assessment Techniques to the Underground Coal Industry, NERDDC Project 1068 Final Report, NSW Coal Association, State of New South Wales, Australia, 114p.

10

Rita L. Sousa, 2010. Risk analysis for tunneling projects, Ph. D. Thesis, Massachusetts Institute of Technology, USA, 589p.

11

Rita L. Sousa, and Herbert H. Einstein, 2012. Risk Analysis During Tunnel Construction Using Bayesian Networks: Porto Metro Case Study, Tunnelling and Underground Space Technology, 27(1), p.86-100.

10.1016/j.tust.2011.07.003
12

Wu, P., Lin, F., Huang, J., and Xu Y., 2024. Multiscale evaluation of tunnel construction safety risk: a case study of an ofshore tunnel construction in Ningbo, Journal of Engineering and Applied Science, 71(108), p.1-20.

10.1186/s44147-024-00441-7
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 61
  • No :4
  • Pages :296-306
  • Received Date : 2024-08-01
  • Revised Date : 2024-08-20
  • Accepted Date : 2024-08-23