All Issue

2012 Vol.49, Issue 3 Preview Page

Research Paper

30 June 2012. pp. 292-298
Abstract
This work was conducted to optimize the completion design of pad-drilled shale gas well in Horn river area, Canada, which was achieved through the analysis of well interference. Considering many empirical project results conducted by many companies, there are some restrictions in increasing horizontal well length and they require optimization of fracture volume and well spacings. Using the analysis data on a conducted completion program in the area, well intereference was studied with respect to pressure changes in the surrounding wells and microseismic monitoring data. Through the analysis, we show that well interference is observed at spacing of 400~600 m when fracture volumes of 3,000~4,000 m3/stage is injected in Muskwa formation. This result is consistent with the fracture length derived by the analysis of microseismic data.
본 연구는 캐나다 혼리버 지역 셰일가스 개발을 위하여 적용된 패드에서 가스정 완결 중에 발생된 가스정간의 간섭현상 분석을 통해 완결작업 설계의 최적화를 위하여 수행하였다. 많은 기업들이 완결작업 설계를 최적화하기 위하여 실험적 프로젝트를 진행하고 있으나, 현장에서는 수평정의 수평 길이 증가에 제약이 있을 뿐만 아니라 파쇄균열부피 및 가스정간 간격 등의 설계에 대한 최적화 작업이 필요한 상황이다. 따라서, 혼리버 지역에서 수행된 가스정 완결 프로그램을 분석하고, 주변 가스정에서의 압력변화 자료와 마이크로사이즈믹 모니터링 자료를 이용하여 완결 작업 중에 발생된 가스정간의 간섭현상을 통해 완결 프로그램의 최적 설계인자를 분석하였다. 그 결과, Muskwa 층에서 3,000~4,000 m3/stage의 수압파쇄액을 적용한 경우 400~600 m 이하에서 간섭현상이 발생된 것으로 나타났다. 이는 마이크로사이즈믹의 자료분석을 통한 균열발생길이 결과와도 일치함을 확인할 수 있었다.
References
  1. 박재현, 손두기, 김인기, 성원모, 2001, “표준곡선을 이용한 수평정 시험의 압력 거동 분석 연구,” 한국자원공학회지, 제38권 4호, pp. 283-291.
  2. 성원모, 유인항, 김인기, 1995, “단열저류층에서 가스의 고속-난류유동 영향하에 결정된 최적길이를 이용한 생산성분석에 관한 연구,” 한국자원공학회지, 제31권 3호, pp. 294-306.
  3. Graham, M., 2011, Encana corporation 2011 Key resource play conference call series - Horn river, October 4, pp. 9-10.
  4. Lara, C., 2010, “British Columbia’s key natural gas plays - Horn river and Montney,” Prince George Resources Expo, June 4, pp. 39-41.
  5. Michelle, W., 2011, Minifrac and after clousure analysis - ECA Kiwigana b-14-D, April 14, pp. 3-7.
  6. NEB, 2011, Oil and Gas report 2011 - Ultimate potential for unconventional natural gas in Northeastern British Columbia’s Horn river basin, May, p. 9.
  7. Reynolds, M.M. and Munn, D.L., 2010, “Development update for an emerging shale gas giant field-Horn river basin, British Columbia, Canada,” SPE Unconventional gas conference, SPE 130103, Pittsburgh, Pennsylvania, USA, February 23-25, pp. 1-8.
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society for Geosystem Engineering
  • Journal Title(Ko) :한국지구시스템공학회지
  • Volume : 49
  • No :3
  • Pages :292-298