All Issue

2017 Vol.54, Issue 5 Preview Page

Research Paper

31 October 2017. pp. 502-511
Abstract
References
1
Austin, L. G. and Bagga, P., 1981. An analysis of fine dry grinding in ball mills. Powder Technology, 28(1), 83-90.
10.1016/0032-5910(81)87014-3
2
Austin, L.G. and Bhatia, V.K., 1972. Experimental methods for grinding studies in laboratory mills. Powder Technology, 5(5), 261-266.
10.1016/0032-5910(72)80029-9
3
Austin, L.G. and Klimpel, R.R., 1984. Ball wear and ball size distributions in tumbling ball mills. Powder Technology, 41(3), 279-286.
10.1016/0032-5910(85)80026-7
4
Austin, L.G., 1973. A commentary on the Kick, Bond and Rittinger laws of grinding. Powder Technology, 7(6), 315-317.
10.1016/0032-5910(73)80042-7
5
Austin, L.G., Klimpel, R.R., and Luckie, P.T., 1984. Process engineering of size reduction: ball milling, 1st Ed., Vol. 1, Society of Mining Engineers of the American Institute of Mining, Metallurgical, and Petroleum Engineers, New Jersey, United State of America.
6
Bond, F.C., 1952. The third theory of comminution, Trans. AIME, Min. Eng. ed 193, 484-494.
7
Brochot, S., Durance, M.V., Villeneuve, J., d'Hugues, P., and Mugabi, M., 2004. Modelling of the bioleaching of sulphide ores: application for the simulation of the bioleaching/gravity section of the Kasese Cobalt Company Ltd process plant. Minerals Engineering, 17(2), 253-260.
10.1016/j.mineng.2003.09.016
8
Chimwani, N., Glasser, D., Hildebrandt, D., Metzger, M.J., and Mulenga, F.K., 2013. Determination of the milling parameters of a platinum group minerals ore to optimize product size distribution for flotation purposes. Minerals Engineering, 43, 67-78.
10.1016/j.mineng.2012.09.013
9
Chimwani, N., Mulenga, F.K., Hildebrandt, D., Glasser, D., and Bwalya, M.M., 2014. Scale-up of batch grinding data from simulation of industrial milling of platinum group minerals ore. Minerals Engineering, 63, 100-109.
10.1016/j.mineng.2014.01.023
10
Cho, H.C. and Kim, J.Y., 2000. Mathematical modeling and simulation of grinding circuits. J. of the Korean Society of Mineral and Energy Resources Engineers, 37(6), 448-458.
11
Fuerstenau, D.W., Clutch, J.J., and De, A., 1999. The effect of ball size on the energy efficiency of hybrid high-pressure roll mill/ball mill grinding. Powder Technology, 105(1), 199-204.
10.1016/S0032-5910(99)00138-2
12
Herbst, J.A. and Fuerstenau, D.W., 1980. Scale-up procedure for continuous grinding mill design using population balance models. International J. of Mineral Processing, 7(1), 1-31.
10.1016/0301-7516(80)90034-4
13
Jung, M.U., Han, S.S., Nam, C.W., Park, K.H., and Park, J.K., 2017. Closed Grinding Circuit Design of Cu-Ni-Co-Fe-S Matte. J. of the Korean Society of Mineral and Energy Resources Engineers, 54(1), 57-65.
10.12972/ksmer.2017.54.1.057
14
Kwon, J., Jeong, J., and Cho, H., 2016. Simulation and opti-mization of a two-stage ball mill grinding circuit of molyb-denum ore. Advanced Powder Technology, 27(4), 1073-1085.
10.1016/j.apt.2016.03.016
15
Lee, H. and Cho, H. C., 2006. Breakage characteristics of some industrial minerals in a ball mill. J. of the Korean Society of Mineral and Energy Resources Engineers, 43(6), 533-542.
16
Lee, H. and Cho, H. C., 2013. Determination of Breakage Parameters on the Nonmetallic Minerals. J. of the Korean Society of Mineral and Energy Resources Engineers, 39(4), 248-256.
17
Lee, H., Kim, K.H., Kim, W.T., and Kim, S.B., 2013. Deter-mination of Breakage Parameters in Mathematical Grinding Model by Weight-adjustment Modification. J. of the Korean Society of Mineral and Energy Resources Engineers, 50(1), 80-87.
10.12972/ksmer.2013.50.1.080
18
Mulenga, F.K., 2017a. Sensitivity analysis of Austin's scale-up model for tumbling ball mills—Part 1. Effects of batch grinding parameters. Powder Technology, 311, 398-407.
10.1016/j.powtec.2017.02.007
19
Mulenga, F.K., 2017b. Sensitivity analysis of Austin's scale-up model for tumbling ball mills—Part 2. Effects of full-scale milling parameters. Powder Technology, 317, 6-12.
10.1016/j.powtec.2017.04.043
20
Perry, J.H., 1963. Chemical Engineers' Handbook, 4th Ed., Vol. 1, McGraw-Hill, New York, United State of America, p.8-8.
21
Walker, W.H., Lewis, W.K., McAdams, W.H. and Gilliand, E.R., 1937. Principles of Chemical Engineering, 3rd Ed., Vol. 1, McGraw-Hill, New York, United State of America, p.255-255
22
Whang, K.U. and Lee, M.Y., 1991a. Estimation of Selection and Breakage Functions from Batch Grinding Data and its Application to Simulation. J. of the Korean Society of Mineral and Energy Resources Engineers, 28, 464-471.
23
Whang, K.U. and Lee, M.Y., 1991b. The Effect of Ball Size on the Wet Grinding of Talc. J. of the Korean Society of Mineral and Energy Resources Engineers, 28, 46-53.
Information
  • Publisher :The Korean Society of Mineral and Energy Resources Engineers
  • Publisher(Ko) :한국자원공학회
  • Journal Title :Journal of the Korean Society of Mineral and Energy Resources Engineers
  • Journal Title(Ko) :한국자원공학회지
  • Volume : 54
  • No :5
  • Pages :502-511
  • Received Date : 2017-09-27
  • Revised Date : 2017-10-18
  • Accepted Date : 2017-10-18